Agenda item

Full Application - Removal or variation of condition 12 on planning approval - NP/DDD/0118/0022 at Bank Top Cottage, Biggin

Minutes:

The Planning Officer introduced the item.

 

The Officer recommendation to approve the application was moved and seconded, put to the vote and carried.

 

RESOLVED:

 

To APPROVE the application subject to the following conditions:

 

1.     The development hereby permitted shall not be carried out otherwise than in complete accordance with the amended site plan drawing number DL17.A2, and the variation plan submitted ‘02-05-2019’.

 

2.     Within 4 months of the date of this permission, all new drystone walling to be erected, as shown on drawing numbers DL17.A2 and Variation Plan submitted 02-05-2019’ shall be laid in the traditional manner in local natural stone, topped with half round stones and built to the same height and form as the adjacent and existing wall and shall be permanently so maintained’

 

3.     No caravan shall remain on the site for a period exceeding four weeks in any calendar year.

 

4.     No caravan or structure shall be placed on the site, which is not capable of being towed on a public highway by a private family car.

 

5.     No tents shall be pitched on the site at any time.

 

6.     No arrivals to, or departures from, the site shall take place before 7a.m nor after 11p.m.

 

7.     No works or development shall take place until full details of the proposed planting shown on plan DL17.A2, have been approved in writing by the Authority. The scheme shall include details of proposed species and spacing. Once approved, the development shall proceed only in complete accordance with the approved details.

 

8.     The landscaping tree and shrub planting approved by condition 7 shall be carried out in the first planting and seeding seasons following first use of the campsite or following completion of the development, whichever is the sooner.  Any trees or plant which die, are removed or become seriously damaged or diseased shall be replaced in the next planting season with others of a similar size and species or in accordance with an alternative scheme previously agreed in writing by the Authority.

 

9.    Prior to its construction, details of the design and materials of the new access driveway shall be submitted to and agreed in writing by the Authority. The development shall thereafter proceed only in accordance with the approved details.

 

10.  No part of the proposed development shall be brought into use until space has been laid out within the site in accordance with the approved application drawings for vehicles to be parked and for vehicles to turn so that they may enter and leave the site in forward gear.

 

11.  There shall be no gates or other barriers within 15m of the nearside highway boundary and any gates shall open inwards only, unless otherwise agreed in writing by the Local Planning Authority.

 

12.  The proposed access drive to the A515 shall be no steeper than 1 in 20 for the first 15m from the nearside highway boundary and 1 in 14 thereafter.

 

 

Supporting documents: