Agenda item
Full Application -Conversion of barn to dwelling to include associated access, parking and landscaping works, Hollowford Lane, Castleton, (NP/HPK/0822/1076, JRS)
Minutes:
The report was presented by the Planning Officer who outlined out the reasons for approval as set out in the report.
The following spoke under the public participation at meetings scheme:
· Caroline McIntyre- Agent
Members asked if it was possible to condition the development so it remained a permanent dwelling rather than potentially being used as a holiday let in the future. Officers advised that this was not possible under current policy but the matter was being considered as part of the Local Plan Review.
Members requested that the size of the roof lights be restricted. The Planning Officer agreed that this could be done via a condition and that further conditions were also required to agree full details of the proposed package treatment plant, the location of any metre boxes, and the retention of the gate posts to the field entrance with the final details of this entrance to be delegated to Officers to agree in consultation with the Chair and Vice Chair, subject to the submission of an amended plan.
A motion to approve the application with an addition to the condition on the roof lights, and additional conditions regarding the package treatment plant, the location of metre boxes, the retention of the gate posts and further details regarding the gate entrance, was proposed, seconded, voted on and carried.
RESOLVED:
|
|
To delegate approval of the application to the Head of Planning in consultation with the Chair and Vice Chair, approval to be subject to the following conditions:
|
|
|
1. 3 year commencement
2. Development in complete accordance with amended plans, as revised to omit the hay barn parking proposal and second parking space, subject to the following conditions:
3. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that order with or without modification) no improvement or other alteration to the external appearance of the buildings shall be carried out and no extensions, porches, ancillary buildings, satellite antenna, solar or photovoltaic panels, gates, fences, walls or other means of boundary enclosure (other than those specifically approved by this application) shall be erected on the site without an application for planning permission having first been made to and approved in writing by the National Park Authority.
4. Any new stonework shall be in natural, reclaimed stone matching the existing stonework in terms of colour, texture, facing, coursing and pointing.
5. Prior to the installation of any new window or door frames a detailed scheme for the proposed external finish of the window and door frames shall be submitted to and approved in writing by the National Park Authority. All door and window frames shall be recessed from the external face of the stonework to match the existing doors and windows. The window and door frames shall thereafter be finished in accordance with the approved scheme prior to the first occupation of the dwelling and the finish shall be maintained throughout the lifetime of the development hereby approved.
6. The rooflights shall be conservation model rooflights, fitted flush with the roofslope of an appropriate size, to be agreed.
7. Any new or replacement rainwater goods shall match the existing in terms of profile, materials, finish and method of fixing.
8. All pipework, other than rainwater goods, shall be completely internal within the building.
9. Agree details of any external lighting.
10. Carry out landscaping scheme prior to occupation (boundary walling) and planting within first planting season following commencement. Provide sample of surfacing materials.
11. All new service lines to be underground.
12. Provide new access and parking prior to first occupation.
13. Historic Building Recording: No development shall take place until a Written Scheme of Investigation for a programme of historic building recording, the equivalent of a Level 3 building survey, has been submitted to and approved by the local planning authority in writing.
14. Ecology: All Mitigation, Compensation and Enhancement measures to be implemented.
15. Details of the package treatment plan to be submitted and agreed
16. Location of metre boxes to be agreed
17. Gateposts to be retained and full details of the entrance to be agreed subject to the submission of an amended plan, this to be delegated to the Head of Planning in consultation with the Chair and Vice Chair
|
Supporting documents:
- 0822-1076_ Hollowford barn, item 38/23 PDF 285 KB
- Item 6 - Hollowford Barn, Castleton, item 38/23 PDF 348 KB