Agenda item

Full Application – Demolition of Farmhouse and Erection of Replacement Dwelling; Conversion of Farm Building to Dwelling and Erection of Separate Double Garage, Pineapple House Farm, Baslow Road, Bakewell

Minutes:

It was noted that Members had visited the site on the previous day.

 

The following spoke under the public participation at meetings scheme:

 

·         Mrs Holmes, Applicant’s wife.

 

The recommendation for approval subject to conditions was moved and seconded.

 

In response to Members’ queries the Planning Officer stated that the bat survey had now been carried out, the detached garage would be tied to the barn conversion rather than the main house and the two new houses would have shared access from the main road.  He also stated that the roof space in the garage would be ancillary accommodation and an extra condition could be added to tie the garage to the barn conversion.  It was agreed to amend condition 5 by omitting satellite dishes.  It was also agreed to expand condition 25 to include submission of a detailed scheme for the protection of trees on site.

 

The motion for approval subject to conditions with the agreed amendments and extra condition was voted on and carried.

 

RESOLVED:

 

That the application be APPROVED subject to the following conditions:

 

1.    3 year implementation time limit

2.    The development shall not be carried out other than in complete accordance with the submitted plans.

3.    Exiting corrugated tin sheet buildings and later additions to the detached barn to be demolished and removed from the site prior to the commencement of the barn conversion works.

4.    Reposition window opening to the wc in East Elevation of the barn conversion

5.    Remove permitted development rights for extensions, alterations and outbuildings, porches, walls, fences and solar panels.

6.    Submit and agree hard and soft landscaping scheme.

7.    Restrict domestic curtilage to be limited to area edged red on original submitted 1:500 scale block plan.

8.    Submit and agree any details of spoil removal arising from the demolition works.

9.    Replacement dwelling to be set into the sloping ground levels. Submit and agree plans showing the proposed ground levels.

10.  Development to be built to a minimum of Code Level for Sustainable Homes required of RSLs.

11.  Design Stage Assessment and Interim Code certificate to be submitted and agreed before work commences

12.  Prior to first occupation copy of summary score sheet and Post Construction Review Certificate to be submitted.

13.  All stonework to be in random-coursed natural limestone. Sample panel to be agreed.

14.  Roofs to replacement dwelling to be clad in natural local gritstone slates laid in diminishing courses towards the ridge. Sample to be submitted and agreed.

15.  Roofs to the converted barn (except for the contemporary flat-roofed extension) and the new garage building serving the converted barn to be clad in natural blue slate.

16.  Submit and agree sample of roof cladding and fascia for the contemporary extension to the converted barn.

17.  Dressed natural gritstone voussoirs, quoinwork, lintels, sill and surrounds to window and door openings where shown on the approved plans.

18.  Timber vertical sliding sash window frames to all window openings in the rebuilt dwelling.

19.  Timber doors and timber window and door frames (including conservatory).

20.  Prior the occupation of either of the two dwellings, the existing access to be modified in accordance with the submitted plan and provided with a 2.4m x 63m visibility splay in the north-eastern direction and a 2.4m x 61m visibility splay in the south-western direction with these splays maintained in perpetuity.

21.  Parking and manoeuvring spaces (including garaging) to be provided and maintained.

22.  Any new service lines to the property to be underground.

23.  Foul water to be dealt with by a package treatment plant in the location shown on approved plans. Submit and agree details of disposal of foul and surface waters.

24.  Minor Design Details.

25.  Retain existing trees – submit a detailed scheme for the protection of trees on site.

26.  Submit and agree details of appropriate Environment Management measures, including details of the ‘built-in’ solar slate/panels on the new garage building for the barn conversion.

27.  Submit and agree details of external lighting.

28.  Ecological mitigation and enhancement conditions.

29.  Ancillary tie between garage and barn conversion.

 

Supporting documents: