Decision details

Full Application - Construction of New Agricultural Dwelling, Elizabethash Farm, Hayfield Road, Chinley

Decision status: Recommendations Approved

Is Key decision?: No

Is subject to call in?: No

Decisions:

The Planning Officer reported  that, following sight of the agenda report, the objectors  had confirmed that they were satisfied that their concerns had been addressed and therefore had withdrawn their objections. The Planning Officer also updated the recommendation to insert into the Section 106 agreement an Agricultural occupancy restriction.

 

The following spoke under the public participation at meetings scheme:

 

·         Holly Frost, Applicant

 

The officer recommendation was moved, seconded, put to the vote and carried.

 

RESOLVED:

 

To APPROVE the application subject to prior entry into a legal agreement to restrict occupancy of the dwelling to an agricultural worker and to prevent the separate sale of land in ownership, the new house, and existing buildings and subject to the following conditions / modifications.

 

1.         Statutory 3 year time limit for implementation.

 

2.         Development not to be carried out otherwise than in accordance with specified amended plans.

 

3.         The residential caravan on site shall be removed and the land restored to its previous condition within 1 month of the first occupation of the dwelling hereby approved.

 

4.         Removal of permitted development rights for external alterations, extensions, outbuildings, hard standing, walls, fences and other means of enclosure to the approved dwelling.

 

5.         No development shall take place until a detailed scheme showing the finished ground levels within the site has been submitted and approved. The development shall then be carried out in accordance with the approved scheme.

 

6.         No development shall take place until a detailed scheme of landscaping (including planting, earth mounding, re-seeding, walls, gates and hard standings) has been submitted and approved. The development shall then be carried out in accordance with the approved scheme and maintained in perpetuity.

 

7.         Any new services to be placed underground.

 

8.         Foul sewerage to be dealt with by a package treatment plan. Prior to the installation of the package treatment plant, full details of which shall have first been submitted and approved. The development shall then be carried out in accordance with the approved scheme.

 

9.         Development shall be built to a minimum of the Government’s Code Level for Sustainable Homes Level (or its successor) required of Registered Social Landlords at the time of commencement of the building works.

 

10.       No development shall take place until a design stage assessment (under the Code for Sustainable Homes or its successor) has been carried out and a copy of the summary score sheet and Interim Code Certificate indicating that the development can achieve the stipulated final Code Level (or any such national mechanism that replaces this) have been submitted to and approved in writing by the National Park Authority.

 

11.       Prior to the occupation of the dwelling hereby approved, a copy of the summary score sheet and Post Construction Review Certificate (under the Code for Sustainable Homes or its successor) shall be submitted to the Authority verifying that the agreed standards have been met.

 

12.       Conditions to specify or require prior approval of architectural and design details for the dwelling including, stonework, roof materials, roof verges, rainwater goods, chimneys, window and door design and finish and solar panels.

 

13.       Prior approval of space within the site for accommodation, storage of plant, materials and parking for site operative’s vehicles during construction works.

 

14.       Parking and turning areas to be laid and constructed prior to first occupation of the dwelling and maintained in perpetuity.

 

15.       Details of bin storage space and dwell area for use on refuse collection days to be submitted and approved. The development shall then be carried out in accordance with the approved scheme.

Publication date: 03/03/2015

Date of decision: 13/02/2015

Decided at meeting: 13/02/2015 - Planning Committee

Accompanying Documents: