Decision details

Full Application - Conversion of The Mill to Residential Use. Repair and Consolidation of the Shell and Interior Including, new Cast-Metal Rainwater Goods, Fenestration and Joinery. Re-Roof and Timber Repairs. Pedestrian Bridge to Connect to the A6,

Decision Maker: Planning Committee

Decision status: Recommendations Approved

Is Key decision?: No

Is subject to call in?: No

Decisions:

Cllr H Laws declared a personal interest in Items 8 and 9 as he was a member of the National Trust.

 

Having declared a prejudicial interest in Items 8 and 9, the Director of Planning left the room and took no part in the proceedings relating to either item.

 

It was noted that Members had visited the site on the previous day.

 

The planning application Item 8 and the listed building application Item 9 were considered together but voted upon separately.

 

The planning application proposed the conversion of the mill building to a single open market dwelling. The officer confirmed that there would be little external change and that those changes would be of benefit to the building.

 

The following spoke under the Authority’s Public Participation Scheme:

 

·         Mr A Bench, Agent

 

The recommendation of approval was moved, seconded, voted upon and carried.

 

RESOLVED:

 

That the application be APPROVED subject to the following conditions:

 

1.

3 year implementation time limit

 

2.

Adopt amended plans including plans for the sloped bridge with yachting wire infill panels.

 

3.

Conversion to be within shell of building with no demolition or rebuild without the prior written agreement of the National Park Authority.

 

4.

All repairs to historic fabric outlined in the submitted ‘Condition Survey and Repair Methods’ to be completed before the dwelling is first occupied.

 

5.

No development to commence until a detailed scheme for the bridge has been submitted and agreed in writing.  The details shall include cross sections, design calculations and details of construction, materials etc., a schedule for installation and a remediation plan in the event that the conversion is not carried out. 

 

6.

Pedestrian bridge to be completed before dwelling is first occupied.

 

7.

The pedestrian bridge shall be ancillary to and for the use of occupiers of The Mill only in emergency flood situations.

 

8

Sample of colour for steelwork and yachting wire to bridge to be submitted and agreed.

 

9.

Any gates to the pedestrian bridge shall open inwards only.  Excluding the means of attachment no part of the proposed pedestrian bridge shall be located within the public highway.

 

10.

Extent of domestic curtilage to be limited to area edged green on plan no. 14158/P/102.1a

 

11.

Parking spaces and bin store and bin dwell area to be provided and maintained throughout the life of the development.

 

12.

Details of construction compound to be submitted and agreed prior to commencement.

 

13.

Recommendations of Protected Species Survey to be fully adhered to.

 

14.

Submission and agreement of a scheme of archaeological monitoring measures.

 

15.

Lighting scheme to be submitted and agreed.

 

16.

Details of internal doors to be submitted and agreed.

 

17.

Details of etched map on lobby glass to be agreed.

 

18.

Windows and doors to be repaired on a like for like basis unless otherwise agreed in writing by the National Park Authority.

 

19.

Photographic record of internal and external features to be submitted before work commences.

 

20.

Minor Design Details.

 

Publication date: 08/04/2015

Date of decision: 13/03/2015

Decided at meeting: 13/03/2015 - Planning Committee

Accompanying Documents: