Agenda item
Full Application - Change of use of Sough Mill to a residential dwelling, associated internal and external alterations including a replacement ground floor room, works to the sluice gate, works of hard and soft landscaping, parking and other works incidental to the application proposals at Sough Mill, Over Haddon (NP/DDD1224/1403/GG).
Minutes:
P Brady returned to the meeting
Item 11 was presented and discussed at the same time as item 12 but the votes were taken separately.
Some Members had visited the site the previous day.
The Planning Officer presented the report and outlined the reasons for approval as set out in the report. The proposed works will restore the building and retain machinery and features.
The following spoke under the public participation at meetings scheme:
Caroline McIntyre - Agent
Members were supportive of restoration of the building, whilst also keeping the historic features of the Mill. There was concern about the foul water drainage system as the site is adjacent to a river. Members queried the oil fired heating system as the best option, the housing of the storage tank and transport of oil onto the site.
A motion to approve the application subject to condition 7 being amended to allow for an alternative energy source to serve the building was moved, seconded, put to the vote and carried.
RESOLVED:
That the application be APPROVED subject to the following conditions:
1. Statutory time limit
2. Approved plans
3. Details of doors and door and window frames, rooflights, rainwater goods, roof slates and flue to be submitted and approved
4. Sample of the timberwork to the wheelhouse elevations to include colour and treatment.
5. Sample of roofing material to wheelhouse
6. Sample panel of retaining walls
7. Details of the energy source to supply the building, including type of fuel, piping and siting and screening of equipment shall be submitted for approval and carried out in accordance with the approved details prior to the occupation of the dwellinghouse.
8. Details of screening to bin store
9. Sample/details of all hard surfacing materials and retention
10. Soft landscaping provision
11. Soft landscaping maintenance
12. Scheme/programme of archaeological works
13. Compliance with mitigation and enhancement measures identified in the Ecology Survey and approved drawings
14. Compliance with the Construction Environment Management Plan (CEMP) by Dunelm Ecology
15. Safeguarding nesting/breeding birds
16. In accordance with the additional information regarding surface water, foul drainage and waste water run-off details received on 12 March 2025
17. Approve scheme to treat and remove suspended solids from surface water run-off during construction works
18. Provision, monitoring and maintenance of the package treatment plant
19. Construction site layout provision during conversion in accordance with plan
20. Provision of parking space prior to occupation and retention of such
21. Removal of caravan from the site within two months of occupying the dwelling and thereafter no caravan to be stationed on the land.
Supporting documents:
-
1224-1403_Sough Mill Over Haddon Committee Report AM, item 75/25
PDF 253 KB
-
Item 11 - Sough Mill- Site Plan, item 75/25
PDF 999 KB