Agenda item

Listed Building Consent - Change of use of Sough Mill to a residential dwelling, associated internal and external alterations including a replacement ground floor room, works to the sluice gate, works of hard and soft landscaping, parking and other works incidental to the application proposals at Sough Mill, Over Haddon (NP/DDD/1224/1404 GG)

Minutes:

Item 12 was presented and discussed at the same time as Item 11, but the votes were taken separately.  Please see full minute details 76/25 above.

 

A motion to approve the application was moved, seconded, put to the vote and carried.

 

 

RESOLVED:

 

That the application be APPROVED subject to the following conditions:

1.     Statutory time limit

 

2.     Approved plans

 

3.     Details of doors and door and window frames to be submitted and approved

 

4.     Details of roof lights to be submitted

 

5.     Details of rainwater goods to be submitted and approved

 

6.     Sample of any new roof slates

 

7.     Sample of the timberwork to the wheelhouse elevations to include colour and treatment

 

8.     Sample of roofing material to wheelhouse

 

9.     Sample/details of the flue pipe

 

10.  Sample panel of retaining walls

 

11.  Details of the energy source to supply the building, including type of fuel, piping and siting and screening of equipment shall be submitted for approval and carried out in accordance with the approved details prior to the occupation of the dwelling house.

 

12.  Details of screening to bin store

 

13.  Sample/details of all hard surfacing materials and retention

 

14.  Soft landscaping provision

 

15.  Soft landscaping maintenance

 

16.  Scheme/programme of archaeological works

 

17.  Mix, methodology and sample panel for any repointing, to be informed by mortar analysis and observation of historic finishes.

 

18.  Methodology for repair and treatment of any structural timber.

 

19.  Methodology for conservation of mill machinery.

 

20.  Methodology for the dismantling and rebuilding of the drying kiln.

 

21.  Details of the repair of the sluice gate, including drawings and an identification of the timber used.

 

 

The meeting adjourned at 12:35pm and reconvened at 12:40pm

 

J Wharmby left the meeting

K Potter left the meeting

 

 