Agenda item
Full Application - Retention Of Spa In Basement With New Entrance Area And Conversion Of Upper Floors Into Two Apartments And Six Townhouses At Spa Building, Rutland Mews, Bakewell
Minutes:
The following spoke under the public participation at meetings scheme:
· Mr D Oulsnam, Agent.
The recommendation for approval subject to conditions was moved and seconded. An amendment to condition 3 to restrict the use to a health spa and ancillary café only was agreed. The motion was then voted on and carried.
RESOLVED:
That the application be APPROVED subject to the following conditions:
1. 3 year implementation time limit.
2. Adopt amended plans.
3. The basement of the premises shall be used for a health spa and
ancillary café and for no other purposes (including any other purpose in
Class D2 of the schedule to the Town and Country Planning (Use
Classes) Order 1987 or in any order revoking and re-enacting that
order).
4. The spa shall be open to customers no earlier than 9am and no later
than 8pm on any one day.
5. Hard and soft landscaping scheme to be submitted and agreed in
writing. Thereafter the scheme shall be fully implemented.
6. All mitigation measures detailed in the submitted flood risk assessment
to be carried out prior to first occupation of the development hereby
approved, including that finished floor levels shall be set no lower than
120.80m above Ordnance Datum (AOD).
7. The premises the subject of the application shall not be taken into
use/occupied until the proposed footbridge and linking footway have
been provided in accordance with approved drawing numbers 15/07/1A
and 15/07/2.
8. The premises the subject of the application shall not be taken into
use/occupied until on-site parking (including secure covered cycle
parking) has been provided in accordance with the application drawings
and maintained thereafter free from any impediment to its designated
use.
9. Remove permitted development rights for alterations, extensions,
outbuildings and boundaries.
10. Details of the finish for the steelwork, the design and finish of the
balustrading and timber decking and the materials for the footpath
surfacing shall be submitted and agreed. Thereafter the bridge and path
shall be constructed in accordance with the agreed details.
11. New window and door frames to be dark grey aluminium in accordance
with submitted sample.
12. All new window and door frames to be recessed a minimum of 100mm
(approx. 4 inches) from the external face of the wall.
13. Rooflights to be fitted flush with the rooflsope.
14. All pipework to be internal.
15. Details of the position, design and finish of meter boxes to be submitted
and agreed.
16. The boundary between the external spa seating area and the residential
courtyard shall be a 2m high natural drystone wall to match the adjacent
walls unless otherwise agreed.
17. The existing opening on the north side of the existing boundary wall
shall be blocked off using natural limestone to match the adjacent wall.
18. All new external walls shall be in natural limestone with half round.
gritstone copers to match the adjacent walls.
Supporting documents:
- (NP/DDD/0716/0622, P954, 422050/368566, 06/07/2016/ALN), item 147/16 PDF 274 KB
- Site Plan, item 147/16 PDF 1 MB