118 Full Application - Removal of existing 24M airwave tower and replacement with a 35M tower with attached antennae and dishes for airwave, the ESN (EAS) and SRN networks. At ground level, additional cabins/cabinets will be positioned on the old and new tower bases, along with a standby generator. A separate VSAT dish enclosure will be established 100M to the south west of the main compound at Airwave Telecommunications Tower at Snake Pass Clearing, Snake Road, Bamford (NP/HPK/1020/0947, JK.) PDF 251 KB
Additional documents:
Minutes: